connect with us Twitter Facebook Email
Current Projects
Transit

There’s a lot happening in the Golden Triangle to improve transit, roadways, bridges, bike and pedestrian trails! Shift San Diego is your source for transportation solutions during construction.

Stay up-to-date on current and upcoming projects in the area. Monitor #ShiftSanDiego on Twitter and Facebook to get information and updates.

Highlighted Projects
  • I-5/Genesee Avenue Interchange Project: The project will increase the existing six-lane Genesee Avenue overpass with a ten-lane bridge. Along with the replacement of the overcrossing, the project will also widen the freeway access ramps, add an auxiliary lane in the northbound direction on I-5 between Genesee Avenue and Roselle Street, and construct a new, separated bike path that connects the Sorrento Valley COASTER station to UC San Diego.
    • Sign up for project updates.
    • Review the construction map and schedule.
    • View a live webcam. 
Golden Triangle Projects
  • I-5/Genesee Avenue Interchange Project:This project will increase the number of lanes (from six to ten) on the Genesee Avenue overpass to improve traffic flow and reduce congestion. Bike paths and pedestrian sidewalks also will be included to maximize east and west bike and pedestrian access on Genesee.
    • Construction is ongoing until 2017.
    • Sign up for project updates. 
  • I-805 North Express Lanes Project (Stage 1): The four-mile area of the I-805 from just south of State Route 52 to just north of Mira Mesa Boulevard in San Diego is being widened to accommodate new HOV/carpool lanes.
    • Periodic lane reductions and closures will be required during construction.
    • Construction is ongoing until 2016.
    • Sign up for project updates.
  • Mid-Coast Corridor Transit Project: The initial construction (the relocation of utilities) is in progress, with major construction starting in 2016 later this year.
  • SuperLoop Rapid: Phase III of the SuperLoop Rapid Transit Project is in the final design stage. SANDAG is planning five additional stations and transit signal priority equipment on existing traffic signals in the La Jolla Colony segment, as well as a new station on Route 204, to match other amenities along the SuperLoop Rapid route. Construction is expected to begin in 2016.
    • Sign up for project updates at superloop@sandag.org. 
  • UTC Transit Center: The UTC Transit Center is now temporarily relocated to accommodate construction of a new and improved transit center.  For now, all MTS and NCTD routes serving the transit center are picking up and dropping off passengers at temporary stops along Genesee Avenue or La Jolla Village Drive.  View a map of the relocated stops here.  When the UTC Transit Center reopens in mid-2016, it will have state of the art electronic signs, improved passenger waiting areas, and a dedicated bus entrance, that will shorten trip times. 
  • Sorrento Valley Double Track: SANDAG and NCTD are working together to add a second mainline rail track for approximately 1.1 miles to the north of Sorrento Valley Station to improve COASTER and Amtrak reliability. A new 81-space surface parking lot was added to the south of the station. There are now a total of 189 parking spaces to serve transit riders. 
    • Construction activity may include impacts to train on-time arrivals, parking access, and station access.
    • Construction is ongoing through 2015.
    • Sign up for project updates.